Monday, 22 October 2018

Rubber Mulch for Play Area in Elsdon #Rubberised #Mulch #for...



Rubber Mulch for Play Area in Elsdon #Rubberised #Mulch #for #Playgrounds #Elsdon https://t.co/plGKXTGA7r

from Rubber Play Bark https://rubberplaybark.tumblr.com/post/179325358027
via IFTTT

source https://bondedmulchspecification.tumblr.com/post/179325481809

Rubber Playground Mulch Suppliers in Swansea #Rubberised #Mulch...



Rubber Playground Mulch Suppliers in Swansea #Rubberised #Mulch #Suppliers #Swansea https://t.co/6AzT33DVEf

from Rubber Play Bark https://rubberplaybark.tumblr.com/post/179320239962
via IFTTT

source https://bondedmulchspecification.tumblr.com/post/179320524354

Specification of Playground Rubber Mulch in Carrickfergus #Spec...



Specification of Playground Rubber Mulch in Carrickfergus #Spec #of #Playground #Rubber #Mulch #Carrickfergus https://t.co/mujss4LoQq

from Rubber Play Bark https://rubberplaybark.tumblr.com/post/179315534207
via IFTTT

source https://bondedmulchspecification.tumblr.com/post/179315940909

LEAP Local Equipped Area for Play in Na h-Eileanan an Iar #Local...



LEAP Local Equipped Area for Play in Na h-Eileanan an Iar #Local #Equipped #Area #for #Play #Na #h-Eileanan #an #Iar https://t.co/QpPmHkuXzB

from Rubber Play Bark https://rubberplaybark.tumblr.com/post/179311440872
via IFTTT

source https://bondedmulchspecification.tumblr.com/post/179313055274

Lincoln cycle route temporary closure announced

22 October 2018
Walkser on Water rail way

A stretch of the National Cycle Network which connects Washingborough and Lincoln, known as the Water Rail Way, will be closed for five days from Monday 29 October until the morning of Saturday 3 November.

The closure is necessary to allow Galiford Try to erect a road bridge over the cycle route as part of the construction of the Lincoln bypass. During the closure, two diversions will be in place for pedestrians and cyclists hoping to use the pathway which forms part of Route 1 of the National Cycle Network. 

Commenting on the closure Martyn Brunt, Sustrans Land Manager, Midlands & East said:

“Due to the constrained nature of the site (which is hemmed between two water courses), there are very few access points, so the closed section is quite long. There will be signed diversions in place, for pedestrians, this involves using the opposite bank of the River Witham, however for cyclists it involves a detour onto local roads, so Sustrans wants people on bicycles to be aware as they may wish to plan ahead for their journey.”

For further information on the diversion look at the route page on our online map Updates will also be posted to our East Midlands Facebook page and Twitter accounts

from News https://www.sustrans.org.uk/news/lincoln-cycle-route-temporary-closure-announced
via IFTTT

source https://bondedmulchspecification.tumblr.com/post/179311188104

Rubber Playground Mulch in Foley Park #Foley #Park...



Rubber Playground Mulch in Foley Park #Foley #Park https://t.co/dlRHjuGGhA

from Rubber Play Bark https://rubberplaybark.tumblr.com/post/179308138937
via IFTTT

source https://bondedmulchspecification.tumblr.com/post/179308451074

Bonded Mulch Specification

-Several play area surfaces are constructed with bonded rubber bark, that is a product made by using recycled tyres. The truck tyres are cr...